Asghar Ali
Water Treatment & RO Professional
engrasgharali72@gmail.com
http://bit.ly/2up6EpJ
+92 (332) 2247932
July 05, 1988
ELECTRO/13342
BM3175162
Asghar.ali78666
Why Asghar?
§ Qualified and accomplished water treatment & RO specialist possessing strong technical acumen with a knack for ensuring all system projects are planned and executed efficiently. Proficient at employing diverse engineering methods through use of high-tech software and overseeing safety and quality procedures; adept at interpreting clients’ requirements, analyzing system data, delivering case studies, designs and testing
§ Level-headed engineering executive, offering robust analytical & organizational skills with strong methodical aptitude; possessing sound comprehension and experience in water treatment, waste water treatment, reverse osmosis, water desalination (sea water & brackish water)
§ Has ability to execute compliance, quality assurance, system’s operational activities, inspection & equipment maintenance tasks, tenders, automation & control and troubleshooting; proficient at performing electrical & solar instrumentation & commissioning to avoid any outages
§ Motivated individual holds excellent abilities to identify project needs and analyze complex engineering problems and develop innovative processes to improve and modify electrical engineering methods and techniques; adept at estimating & forecasting demand, timescale & costs
CORE STRENGTHS & ENABLING SKILLS
§ RO & Water Desalination
§ Installation & Commissioning
§ Solar System Designing
§ Process Automation & Control
§ Waste Water Treatment & UF
§ Inspection & Troubleshooting
§ Regulatory Compliance
§ PLC & SCADA
§ Electrical & Project Engineering
§ ROSA, Winflows & IMS
§ Project Management
§ Communication & Presentation Skills
PROFESSIONAL EXPERIENCE
Ultimate Engineering Consultants Limited, Peshawar, Pakistan
Working as “Project Manager (Water Treatment & Solar System Design)”, January 2018 – Present
Responsibilities/Accomplishments:
§ Significantly reviewing specifications and recommending engineering changes to achieve objectives of solar design (P.V System and L.V Works), Reverse Osmosis and water filtration plants. Providing technical direction to installation teams during installation, start-up, testing, system commissioning and performance monitoring of solar, water filtration and desalination plants in Pakistan. Performing thermal, stress and cost reduction analyzes and estimation for solar systems. Mobilizing field staff for data collection
§ Developing standard operation procedures and quality & safety standards for solar installation works to optimize efficiency. Developing design specifications and functional requirements for residential and industrial solar energy systems and components
§ Creating plans and designing solar energy system development, monitoring and evaluating activities of effective alternate energy, solar energy and water treatment solutions in accordance with codes and standards using drawings, schematics and instructions, as per client’s requirement. Providing consultancy and low cost designing solutions to clients. Setting up pre-qualification criteria for contractors/firms; preparing tender documents and performing feasibility study of proposed project
Major Projects:
¾ Feasibility study, cost estimate (PC-1), detail design and construction supervision of potable water supply schemes through Reverse Osmosis
¾ Feasibility study, cost estimate (PC-1), detail design and construction supervision of Water Desalination Plants based on Sea water and Brackish water
¾ Feasibility study, cost estimate (PC-1), detail design and construction supervision of Solar Base Tube wells based on fixed and movable structures
A-8, Al-Tahir Center Block-19, Gulshan-e-Iqbal, Karachi, Pakistan
PROFESSIONAL QUALIFICATION
§ Mehran University of Engineering & Technology, Jamshoro, Pakistan (2006 – 2009)
BE – Electronics
PAK OASIS Industries (Pvt.) Limited, Karachi, Pakistan
Worked as “Technical Manager”, March 2015 – December 2017
Responsibilities/Accomplishments:
§ Efficiently established operational objectives and worked directly with subordinate engineers, supervisors, client personnel and as directed, third-party vendors to support project components (trackers, inverters, balance of plant equipment), installation, commissioning, testing, troubleshooting and maintenance. Performed designing, installation & commissioning of sea and brackish water desalination plants of capacity 15000 to 2000000 GPD at Tharparkar district
§ Analyzed and performed cost estimation and budgeting of Reverse Osmosis plants, solar tube wells projects and desalination plants for operation and maintenance. Analyzed and maintained quality of product water as per WHO standards; developed safe operating procedure and implemented HSE guidelines for R.O, U.F and water filtration plants. Developed operation & maintenance manuals, log records to observe dynamics in R.O process; developed preventive and corrective maintenance schedule with minimum shut down
§ Responded to emergency call outs. Analyzed raw water with recommendations and calculations of dosing systems and chemicals & RO projection with ROSA, Winflows and IMS design software. Reported to GM Technical about productions, calculations and maintenance
Major Projects:
¾ Installation, commissioning, operation & maintenance of one of largest solar hybrid water desalination plants of Asia with capacity of 2MGD at Mithi Tharparkar – client Sindh Coal Authority, fulfilling complete demand of drinking water to whole city as per standard of WHO and minimum O & M cost
¾ Installation, commissioning, operation & maintenance of P-750 plants project with capacity of 10000 and 15000 IGPD solar based Sea and Brackish water desalination plants – client Special Initiative Department Govt of Sindh at Tharparkar
¾ Designing and O & M of RO-100 projects of capacity 40000-100000 GPD based on solar, electricity and generator supply – client Sindh Coal Authority at Tharparkar
So Safe Water Technologies (Pvt.) Limited, Karachi, Pakistan
Worked as “Project Engineer”, May 2014 – March 2015
Responsibilities/Accomplishments:
§ Skillfully developed project objectives by reviewing project proposals and plans. Determined project specifications by studying product design, customer requirements and performance standards; performed technical studies and prepared cost estimates
§ Maintained project schedule by monitoring project progress, coordinating activities and resolving problems. Prepared project status reports by collecting, analyzing and summarizing data. Maintained safe working environment by enforcing procedures and regulations
Major Projects:
¾ Installation and commissioning of 300000 USGPD sea water desalination plant with Dissolved Air Floatation, Ultra-filtration and Reverse Osmosis Plant at National Refinery Limited with collaboration of Severn Trent Services of America
¾ Installation and commissioning of 180000 USGPD sea water desalination plant with Ultra-filtration and Reverse Osmosis Plant at Tufail Chemicals (Pvt.) Limited with collaboration of Severn Trent Services of America
¾ Design, installation & commissioning supervision of 100000 GPD Brackish water desalination plant at GETZ Pharma (Pvt.) Limited
ASK Technologies (Pvt.) Limited, Karachi, Pakistan
Worked as “Electrical & Instrument Engineer”, June 2010 – April 2014
Responsibilities/Accomplishments:
§ Actively performed planning, preparing and estimating bids for fixtures, installation and maintenance of equipment. Ensured that emergency equipment, communication and electrical systems are in place. Assisted with upgrades, roll-outs and setting up of equipment
§ Conferred with department heads to coordinate electrical, instrumentation, automation and troubleshooting activities of projects. Developed and enforced safety systems and performed preventive maintenance for all company locations. Resolved electrical and instrumentation issues
§ Managed cost estimation and budgeting of Water treatment and Reverse Osmosis plants and improved work procedures. Supervised execution of projects, operation and maintenance. Analyzed flow, pressure, temperature, level, P.H, ORP, TDS, Chlorine and Turbidity
Major Projects:
¾ Installation, commissioning, operation and maintenance of industrial effluent waste water treatment plant of capacity 2500000 IGPD at Kotri Sindh with Aritim Muhendislik Turkish Company
¾ Testing, commissioning, operation and maintenance of 2*100000 IGPD sea water desalination plants at Karachi port